Community
Participate
Working Groups
1) create a new sync process 2) add an assign activity 3) in the assign properties window choose "output/payload" (on the right side) 4) when the variable initializer pops up choose "yes" 5) change the fixed value generated by the initializer (on the left side) 6) save the changes and check the source for the changes
Fixed: needed to add new "Assign" to model before populating the "From" so that reconciler can find the "From" Resource.