Community
Participate
Working Groups
In diagram creation from an element (for example double click on a class) the user has a dialog with very nice possibilities. It shall be good for a better usage to remember what is the latest tab the user chose. If the user uses all the time the same tab it allows him to not change the tab at each time.
What do you mean by diagram creation? DO you mean indeed the ability to denote hyperlinks between diagrams?
Yes It shall be comfortable for the user to have the previous tab used selected. If a user always create hyperlinks the tab hyperlink creation will be selected, If a user always create heurstic diagram the corresponding tab will be selected
Committed on the branch. About to be committed on the trunk
Committed on trunk