Some Eclipse Foundation services are deprecated, or will be soon. Please ensure you've read this important communication.
Bug 360106 - [Activity Diagram] Difficult to draw links between Structured Activity Nodes
Summary: [Activity Diagram] Difficult to draw links between Structured Activity Nodes
Status: RESOLVED FIXED
Alias: None
Product: Papyrus
Classification: Modeling
Component: Diagram (show other bugs)
Version: 0.10.0   Edit
Hardware: All All
: P3 normal (vote)
Target Milestone: 1.0.0   Edit
Assignee: Project Inbox CLA
QA Contact:
URL:
Whiteboard:
Keywords:
Depends on:
Blocks:
 
Reported: 2011-10-06 10:40 EDT by Alexandre Cortier CLA
Modified: 2014-07-07 04:45 EDT (History)
2 users (show)

See Also:


Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description Alexandre Cortier CLA 2011-10-06 10:40:08 EDT
Build Identifier: Build id: 20110916-0149, Papyrus 0.8.1.v201109301802

It is not possible to create a ControlFlow between two StructuredACtivityNodes (they inherit from ActivityNode). 

Reproducible: Always

Steps to Reproduce:
1. Create an activity diagram
2. Create two SequenceNodes
3. Try to create a ControlFlow between these two SequenceNodes using the palette.
Comment 1 Camille Letavernier CLA 2013-09-09 12:20:48 EDT
This actually works, but the drawing zone is too small (You have to click exactly on the Node's border, which is 1px wide)

Renamed the task accordingly
Comment 2 Camille Letavernier CLA 2014-07-07 04:45:24 EDT
This has been fixed in the latest version (Just before 1.0.0 I think)