Community
Participate
Working Groups
Build Identifier: Build id: 20110916-0149, Papyrus 0.8.1.v201109301802 It is not possible to create a ControlFlow between two StructuredACtivityNodes (they inherit from ActivityNode). Reproducible: Always Steps to Reproduce: 1. Create an activity diagram 2. Create two SequenceNodes 3. Try to create a ControlFlow between these two SequenceNodes using the palette.
This actually works, but the drawing zone is too small (You have to click exactly on the Node's border, which is 1px wide) Renamed the task accordingly
This has been fixed in the latest version (Just before 1.0.0 I think)