Some Eclipse Foundation services are deprecated, or will be soon. Please ensure you've read this important communication.
Bug 355678 - Resized pool results in incorrect message flow start connection point
Summary: Resized pool results in incorrect message flow start connection point
Status: CLOSED FIXED
Alias: None
Product: BPMN2Modeler
Classification: SOA
Component: UI (show other bugs)
Version: unspecified   Edit
Hardware: PC Windows 7
: P3 normal (vote)
Target Milestone: 0.0.1-M2   Edit
Assignee: Robert Brodt CLA
QA Contact:
URL: https://issues.jboss.org/browse/JBPM-...
Whiteboard:
Keywords:
Depends on:
Blocks:
 
Reported: 2011-08-24 06:41 EDT by Robert Brodt CLA
Modified: 2013-06-04 17:15 EDT (History)
0 users

See Also:


Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description Robert Brodt CLA 2011-08-24 06:41:58 EDT
Steps to reproduce:

1) Drag two pools onto a canvas and resize the top one so that it is wider (i.e. thicker).

2) Select message flow and drag the connection from the top to bottom pool.

You should see that the top connection point lies within the pool, rather than on its boundary.
Comment 1 Robert Brodt CLA 2011-12-12 12:32:44 EST
Cosmetic
Comment 2 Robert Brodt CLA 2013-06-04 17:15:30 EDT
Fixed. The editor now uses "ad hoc" anchors instead of the four boundary anchors at each edge, for pools and lanes only.