Community
Participate
Working Groups
1) create from the working copy "as is" 2) check if working copy is up to date beforehand 3) Do update beforehand 4) branch/tag repository HEAD version
Done. How it works: 1) "as is" implementation works just like it always worked 2) checks if there is outgoing or incoming changes and if there is, then shows a warning and stops branching/tagging 3) performs unconditional update beforehand and if there is unresolved conflicts detected, breaks branching/tagging with warning, except this works identically to the option 1) 4) performs branching/tagging based on the repository HEAD revision content