Community
Participate
Working Groups
The publisher refactorings (bug 331974) are integrated in p2 for 3.7M7. The Tycho SNAPSHOT version should use a p2 version that includes these refactorings in order to enable Mac Tycho users to check which of the known issues were resolved. I'd say that we should even go for I-Builds if necessary. I don't consider it likely that we'll do our next release before 3.7M7.
You mean *after* we release first org.eclipse.tycho version, right?
Yes, of course. I just created this bug now for communication with p2.
@Tobias are you working on this or want me to give it a shot? With Indigo RC4 scheduled for this week we may as well just switch Tycho to p2 3.7. No real reason to wait until official release.
I'm not yet working on this, but unless you do it, I'll probably integrate RC4 in about two weeks. I usually remember to update the assigned-to field before starting to work on an issue.
I'll take care of this
Renamed from "Consume publisher refactorings in current SNAPSHOT" to "Update p2 version used by Tycho" to describe the more general use case.
Hi, just let me know if you need additional testing. Thanks Markus
I updated tycho to use equinox, jdt and p2 from eclipse 3.7rc4. If build fails with missing equinox and/or jdt dependencies, please [1] as repository to settings.xml. As far as I know 3.7rc4 is being replaced with rc5 (see Bug 349267), so I did not want to push these jars to maven central yet. [1] https://repository.sonatype.org/content/repositories/tycho-001/