One of the requirements for the Simultaneous Release is to have the so called “ramp down plan”: “Projects must have a written ramp down policy by M6, at the latest, and provide link. The plan should describe when the project plans to be feature complete, have API frozen, and similar. ”
Proposed is the Ramp Down Plan of the WTP top-level project: [1] http://dev.eclipse.org/mhonarc/lists/libra-dev/msg00040.html
The Libra project will use the Ramp Down Plan of the WTP top-level project: http://wiki.eclipse.org/WTP_3.3_Ramp_down_Plan_for_Indigo