Community
Participate
Working Groups
Build Identifier: 20100218-1602 In the sync view often when reviewing a set of changes often I'd like to go back and modify a file. In the CVS sync view I can right click on the file and open it to perform the changes, in the git sync view there is no such option. Reproducible: Always Steps to Reproduce: 1. Sync a project 2. Right click on a resource 3. Context menu does not contain Open option
*** Bug 328902 has been marked as a duplicate of this bug. ***
I'm loving Egit so far, but since switching to Git from SVN the "Open" action in the synchronize view is one that I miss enough that it has motivated me to try to contribute a patch to egit.
Just pushed a commit to gerrit for possible fix. http://egit.eclipse.org/r/2693
Change #2693 merged with commit 1347535dc84cb95b94409a9c33504eb032eea515.