Some Eclipse Foundation services are deprecated, or will be soon. Please ensure you've read this important communication.
Bug 321826 - [Sequence Diagram] DurationConstraint to a message end is drawn on message
Summary: [Sequence Diagram] DurationConstraint to a message end is drawn on message
Status: RESOLVED FIXED
Alias: None
Product: Papyrus
Classification: Modeling
Component: Core (show other bugs)
Version: 0.7.0   Edit
Hardware: PC Windows XP
: P3 critical (vote)
Target Milestone: ---   Edit
Assignee: Vincent Hémery CLA
QA Contact:
URL:
Whiteboard:
Keywords:
Depends on:
Blocks:
 
Reported: 2010-08-05 03:34 EDT by Vincent Hémery CLA
Modified: 2010-08-05 05:41 EDT (History)
0 users

See Also:


Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description Vincent Hémery CLA 2010-08-05 03:34:29 EDT
Draw a duration constraint on two events of a same lifeline, to a message receive event.
The duration constraint is drawn on the targeted message instead of on the lifeline.
Comment 1 Vincent Hémery CLA 2010-08-05 05:41:22 EDT
The problem was due to the fact that the creation was called on the message part instead of on the lifeline part.
When a duration element creation targets a message, the request is now redirected by the tool to the nearest lifeline part.
In case we want to create a duration constraint on the message, the redirection which was performed just after still works.