Community
Participate
Working Groups
Add sort by last changed data to the task list. Would be very handy to have it when preparing status report.
Yup, this could be useful, both as a sorting order and for an Inbox-style presentation of the Task List (the latter is a use case Rob and I have chatted about a couple of times. Notably we don't have this field on AbstractTask right now.
Created attachment 71265 [details] mylar/context/zip
+1 This would be great along with bug#192263 and bug#177208
Rob: tentatively setting for 2.1 since this makes sense to do along with bug 177208.
related bug 225905
Need to defer: http://wiki.eclipse.org/index.php/Mylyn/3.0_Plan#Deferred_Items
*** Bug 248421 has been marked as a duplicate of this bug. ***
My only use case for looking at Bugzilla change notification emails is to check for recently changed bugs. It would be great if this presentation would sort my queries by modification date, showing the most recently changed tasks on top. Combined with a filter to limit the view to bugs changed in the last few hours / days / weeks that would allow very efficient lookup.
We could consider adding this to an "incoming" presentation if we ever resurrect that.
Tentatively considering for the 3.4.x stream which has an Incoming bin in the scheduled presentation. It could be useful to sort that by modification date.
Created attachment 175624 [details] fix
Created attachment 175625 [details] mylyn/context/zip
Patch committed to e_3_6_m_3_4_x branch and head. The sort dialog now has an options to sort by modification date.