Community
Participate
Working Groups
The purpose of this defect is to track the documentation changes and the new test suites that will be required as a result of implementing 147930
The automation framework is in and the complete Client<->Agent will come in i3. The documentation resource is available to start Sept 29. This is not a show stopper for the code checkins for the enh in context 147930 and 147931
Guru, Although test cases can be added during the test pass, I don't think documentation can be delayed until after i2. Our documentation goes through testing and a freeze mode after the end of i2. I'm CCing Ruth to verify this.
Ali, If you look back at the meeting minutes - the doc resources are available starting 9/29 for the two enh in context. If it needs to be done before i2 somebody needs to step up to do this.
Patch applied and test checked in
As of TPTP 4.6.0, TPTP is in maintenance mode and focusing on improving quality by resolving relevant enhancements/defects and increasing test coverage through test creation, automation, Build Verification Tests (BVTs), and expanded run-time execution. As part of the TPTP Bugzilla housecleaning process (see http://wiki.eclipse.org/Bugzilla_Housecleaning_Processes), this enhancement/defect is verified/closed by the Project Lead since this enhancement/defect has been resolved and unverified for more than 1 year and considered to be fixed. If this enhancement/defect is still unresolved and reproducible in the latest TPTP release (http://www.eclipse.org/tptp/home/downloads/), please re-open.