Some Eclipse Foundation services are deprecated, or will be soon. Please ensure you've read this important communication.

Bug 360106

Summary: [Activity Diagram] Difficult to draw links between Structured Activity Nodes
Product: [Modeling] Papyrus Reporter: Alexandre Cortier <alexandre.cortier>
Component: DiagramAssignee: Project Inbox <mdt-papyrus-inbox>
Status: RESOLVED FIXED QA Contact:
Severity: normal    
Priority: P3 CC: cletavernier, papyrus-bugs
Version: 0.10.0   
Target Milestone: 1.0.0   
Hardware: All   
OS: All   
Whiteboard:

Description Alexandre Cortier CLA 2011-10-06 10:40:08 EDT
Build Identifier: Build id: 20110916-0149, Papyrus 0.8.1.v201109301802

It is not possible to create a ControlFlow between two StructuredACtivityNodes (they inherit from ActivityNode). 

Reproducible: Always

Steps to Reproduce:
1. Create an activity diagram
2. Create two SequenceNodes
3. Try to create a ControlFlow between these two SequenceNodes using the palette.
Comment 1 Camille Letavernier CLA 2013-09-09 12:20:48 EDT
This actually works, but the drawing zone is too small (You have to click exactly on the Node's border, which is 1px wide)

Renamed the task accordingly
Comment 2 Camille Letavernier CLA 2014-07-07 04:45:24 EDT
This has been fixed in the latest version (Just before 1.0.0 I think)