| Summary: | Problems in Dojo Calendar widget | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Product: | z_Archived | Reporter: | broy2 | ||||||||||
| Component: | EDT | Assignee: | Huang Ji Yong <hjiyong> | ||||||||||
| Status: | CLOSED FIXED | QA Contact: | |||||||||||
| Severity: | normal | ||||||||||||
| Priority: | P3 | CC: | hjiyong | ||||||||||
| Version: | unspecified | ||||||||||||
| Target Milestone: | --- | ||||||||||||
| Hardware: | PC | ||||||||||||
| OS: | Windows XP | ||||||||||||
| Whiteboard: | |||||||||||||
| Attachments: |
|
||||||||||||
Created attachment 204104 [details]
Calendar in EDT
Screen shot attached of EDT Calendar. Created attachment 204106 [details]
Dojo Calendar dropdown
Created attachment 204107 [details]
EDT Calendar dropdown
The should be a box surrounding the dropdown list of months. The way it is now, the list looks chopped off. Resolved indirectly Verified in 201110100901 build. |
Created attachment 204103 [details] Dojo Calendar test Drop a Calendar on a RUIHandler. The box surrounding the month has both the down arrow and right arrow in it. It should only have the down arrow. The was it is, the 2 arrows overlap. Screen shot attached of Dijit Calendar Test