Some Eclipse Foundation services are deprecated, or will be soon. Please ensure you've read this important communication.

Bug 355678

Summary: Resized pool results in incorrect message flow start connection point
Product: [SOA] BPMN2Modeler Reporter: Robert Brodt <bbrodt>
Component: UIAssignee: Robert Brodt <bbrodt>
Status: CLOSED FIXED QA Contact:
Severity: normal    
Priority: P3    
Version: unspecified   
Target Milestone: 0.0.1-M2   
Hardware: PC   
OS: Windows 7   
URL: https://issues.jboss.org/browse/JBPM-3269
Whiteboard:

Description Robert Brodt CLA 2011-08-24 06:41:58 EDT
Steps to reproduce:

1) Drag two pools onto a canvas and resize the top one so that it is wider (i.e. thicker).

2) Select message flow and drag the connection from the top to bottom pool.

You should see that the top connection point lies within the pool, rather than on its boundary.
Comment 1 Robert Brodt CLA 2011-12-12 12:32:44 EST
Cosmetic
Comment 2 Robert Brodt CLA 2013-06-04 17:15:30 EDT
Fixed. The editor now uses "ad hoc" anchors instead of the four boundary anchors at each edge, for pools and lanes only.