| Summary: | Create 3.6.1 freeze plan | ||
|---|---|---|---|
| Product: | [Eclipse Project] Platform | Reporter: | John Arthorne <john.arthorne> |
| Component: | Website | Assignee: | John Arthorne <john.arthorne> |
| Status: | RESOLVED FIXED | QA Contact: | |
| Severity: | normal | ||
| Priority: | P3 | CC: | daniel_megert, jeffmcaffer, kim.moir, Mike_Wilson, mober.at+eclipse, remy.suen |
| Version: | 3.6 | ||
| Target Milestone: | 3.6.1 | ||
| Hardware: | PC | ||
| OS: | Windows XP | ||
| Whiteboard: | |||
|
Description
John Arthorne
Kim, the last M-build I see is M20100728-0800. Was there no maintenance build this week? If not, then M20100728 will need to be our RC1 build I suppose (Aug. 9). RC1 is just a warmup build for the release train process. http://wiki.eclipse.org/Helios_Simultaneous_Release Here is a draft 3.6.1 freeze plan. Currently it is unchanged from the 3.5.1 plan except for the dates to align with Helios SR1 schedule. http://www.eclipse.org/eclipse/development/plans/freeze_plan_3_6_1.php The maintenance build is scheduled for Friday this week to allow 3.7M1 builds to proceed. Thanks John! Looks good to me. Done. |