Some Eclipse Foundation services are deprecated, or will be soon. Please ensure you've read this important communication.

Bug 321826

Summary: [Sequence Diagram] DurationConstraint to a message end is drawn on message
Product: [Modeling] Papyrus Reporter: Vincent Hémery <vincent.hemery>
Component: CoreAssignee: Vincent Hémery <vincent.hemery>
Status: RESOLVED FIXED QA Contact:
Severity: critical    
Priority: P3    
Version: 0.7.0   
Target Milestone: ---   
Hardware: PC   
OS: Windows XP   
Whiteboard:

Description Vincent Hémery CLA 2010-08-05 03:34:29 EDT
Draw a duration constraint on two events of a same lifeline, to a message receive event.
The duration constraint is drawn on the targeted message instead of on the lifeline.
Comment 1 Vincent Hémery CLA 2010-08-05 05:41:22 EDT
The problem was due to the fact that the creation was called on the message part instead of on the lifeline part.
When a duration element creation targets a message, the request is now redirected by the tool to the nearest lifeline part.
In case we want to create a duration constraint on the message, the redirection which was performed just after still works.