| Summary: | Axis position is not correct after set origin value and enable study chart.[13] | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Product: | z_Archived | Reporter: | Maggie Shen <lshen> | ||||||
| Component: | BIRT | Assignee: | Heng Li <liheeng> | ||||||
| Status: | VERIFIED FIXED | QA Contact: | Xiaoying Gu <bluesoldier> | ||||||
| Severity: | normal | ||||||||
| Priority: | P3 | CC: | bluesoldier, Lionel.wyl | ||||||
| Version: | 2.6.0 | ||||||||
| Target Milestone: | 2.6.1 | ||||||||
| Hardware: | PC | ||||||||
| OS: | Windows XP | ||||||||
| Whiteboard: | Obsolete | ||||||||
| Attachments: |
|
||||||||
Created attachment 168860 [details]
test report
Refactored the computing study layout code of chart engine. Fixed some bugs of study layout of chart. Verified in daily build 2.6.1.v20100804-0630 |
Created attachment 168859 [details] screen shot description: Axis position is not correct after set origin value and enable study chart. build id: 2.6.0 v20100518-0630 steps to reproduce: 1. New a data set with table payments in sample db. 2. New a chart, using the data set. Define checknumber as category series and paymentdate as value series. 3. Go to format chart page, set origin value for x axis to 1/1/2006. 4. On select chart type page, select secondary axis. 5. On format chart page, enable study chart. Actual result: the axis shrinked to a line. See attached screenshot. Expected result: x axis should be positioned where 2006 year is.