| Summary: | [planning] allow lower level granularity of estimated time on tasks | ||
|---|---|---|---|
| Product: | z_Archived | Reporter: | Robert Elves <robert.elves> |
| Component: | Mylyn | Assignee: | Project Inbox <mylyn-triaged> |
| Status: | CLOSED MOVED | QA Contact: | |
| Severity: | enhancement | ||
| Priority: | P2 | CC: | jmsalk, kevwilliams, neerajbhusare, peter, robert.munteanu |
| Version: | unspecified | ||
| Target Milestone: | --- | ||
| Hardware: | PC | ||
| OS: | All | ||
| Whiteboard: | |||
|
Description
Robert Elves
*** Bug 232079 has been marked as a duplicate of this bug. *** I would prefer 1 minute resolution for estimates, but even 5-minutes will do. (FogBugz server reports estimates as hours, but with decimal part, e.g. 3.333 for 3 hours and 20 minutes). We need to push this off to the backlog, since the requirement improvements to local tasks are out of scope of the 3.2 release. Are those interested in this feature wanting to have more full-featured planning for local tasks, or better integration with their repositories' planning features? For me it's better integration for planning features of repository. Mylyn has been restructured, and our issue tracking has moved to GitHub [1]. We are closing ~14K Bugzilla issues to give the new team a fresh start. If you feel that this issue is still relevant, please create a new one on GitHub. [1] https://github.com/orgs/eclipse-mylyn |